Selected commercial refurbishment projects by Jamlin

  01 — PROJECTS

Work that speaks
for itself.

Every project tells a different story, but the approach remains the same: director-led delivery, careful planning and practical refurbishment carried out with minimal disruption.

02 — OUR WORK

A track record built on delivery. 

From office refurbishments in Mayfair to fast-track industrial turnarounds across London and the Midlands, every Jamlin project is delivered director-led, on time and to a high-quality standard. Explore a selection of our recent work below which we are proud to have handed over. 

17 Grosvenor Street — Mayfair facade
17 Grosvenor Street — refurbished reception
17 Grosvenor Street — principal staircase

03 — FEATURED PROJECT

17 Grosvenor Street

Mayfair, W1K · 2026

Refurbishing a fully occupied Mayfair office building.

Upgrading and futureproofing the buildings life safety, fire compartmentation, core M&E infrastructure, access control and security systems, to deliver a market-leading user experience for a premium West End office. Protecting and enhancing the character of a landmark Mayfair building.

Outcome

A refresh of the building's shared spaces and life-safety systems, enhancing the arrival experience and supporting the long-term value of the asset.

Type

Refurbishment works

Programme

6 Weeks

Condition

Fully occupied, live building

Key outcome

Occupied throughout the works

Scope

  • Bespoke joinery
  • Access control and security
  • Core area finishes
  • Life safety upgrades
  • Decoration
  • Building services
Randall House — reception and breakout
Randall House — meeting room
Randall House — building exterior

04 — FEATURED PROJECT

Randall House

Dowgate Hill, EC4R · 2026

Fast-track CAT B fit out for a financial services occupier.

A full CAT B office fit out delivered within a three-week programme. A secure, considered workplace built around the occupier's operational, regulatory and technology requirements.

Outcome

Enhanced security and access control, glazed meeting rooms, integrated AV, joinery and a hosted breakout in oak and stone. Handed over snag-free and ready for immediate occupation.

Type

CAT B Office Fit Out

Programme

3 Weeks

Condition

Occupied building

Key outcome

Completed in just 3 weeks

Scope

  • CAT B fit out
  • Security & access control
  • Meeting rooms & AV
  • Breakout & tea point
  • Joinery & finishes
  • Furniture
Unit 10 Muirhead Quay — warehouse
Unit 10 Muirhead Quay — refurbished office
Unit 10 Muirhead Quay — welfare facilities

05 — FEATURED PROJECT

Unit 10 Muirhead Quay

Barking, East London · 2026

Industrial refurbishment focused on long-term asset value.

A design & build full refurbishment of the warehouse and office accommodation, increasing the net lettable area and improving the building's energy performance to prepare the asset for its next occupier.

Outcome

Warehouse floor area increased by 807 sq ft, EPC rating improved from E to B, welfare facilities rebuilt and a modern, efficient industrial unit delivered within a six-week programme.

Type

Industrial Refurbishment

Programme

6 Weeks

Condition

Vacant industrial asset

Key outcome

+807 sq ft NLA · EPC E → B

Scope

  • Warehouse refurbishment
  • Office refurbishment
  • Structural alterations
  • M&E installation
  • Welfare facilities
  • Energy-efficiency upgrades
Aylesbury Space Business Centre — exterior
Aylesbury Space Business Centre — mezzanine detail
Aylesbury Space Business Centre — mezzanine and stair

06 — FEATURED PROJECT

Aylesbury Space Business Centre

Aylesbury, HP19 · 2026

Three industrial units returned to market in two weeks.

Three vacant industrial units refurbished simultaneously and returned to the market as quickly as possible, clean, presentation-ready accommodation for immediate viewings and letting.

Outcome

All three units completed within a two-week programme. Mezzanine detailing, LED lighting, M&E testing and external improvements, minimising void periods and enabling immediate occupation.

Type

Industrial Refurbishment

Programme

2 Weeks

Condition

Three vacant units, simultaneous

Key outcome

3 units completed in 2 weeks

Scope

  • Decorations
  • Floor repairs
  • LED lighting
  • M&E testing
  • Mezzanine detailing
  • External improvements

— CLIENT NOTE

Jamlin were professional and responsive throughout the entire project. They made it run smoothly with their forward thinking and in-depth understanding of the small elements that can often be trip hazards on smaller projects. The boys are approachable and genuinely want the best result for the client - we highly recommend them and would welcome them back on our projects in a heartbeat.

Matthew Taylor

Project Manager (MAPM) — MAC Construction Consultants

07 — NEXT STEPS

Planning your next project?

Whether you're considering landlord improvements, a CAT A or B fit out, or a wider refurbishment programme, we'd be happy to discuss your project and outline the most practical next steps.